Phase-matched crews on site from week two.
Debris removal, dust suppression, and trade-zone separation run in parallel with live construction—not after trades clear. The right crew, the right containment, every phase.


Protocol built around your build schedule.
Phase 1 — Mobilization: crew on site within the first two weeks. Debris staging, trade-zone barriers, and initial dust suppression established before milestones compound.
Phase 2 — Recurring Scheduled Cleans: fixed-interval sweeps keep the site WSIB-compliant and inspection-ready between framing, mechanical, and drywall milestones.
Phase 3 — Handoff Prep: surfaces, glass, and HVAC vents cleared and documented before the final-clean crew takes over—no gap between phases, no rework.
Safety & Compliance
Surface & Glass
What every active-site clean covers.
WSIB-compliant crew documentation on every visit. Site-appropriate PPE — respirators, hard hats, safety boots — matched to active trade conditions.
Glass dividers, door frames, and window openings wiped clear after each trade phase. Hardware and sills cleared before drywall mud or overspray sets.
Dust & Air Quality
Waste Disposal
No improvised solutions. Each visit is scoped to the current build phase—equipment, PPE, and waste handling matched to what's actually on site that week.
HEPA-filtered vacuum extraction, containment sheeting between active and cleared zones, HVAC vent protection to prevent cross-contamination between floors.
Construction debris sorted, bagged, and staged for licensed disposal. No material left in trade zones between scheduled clean visits.